Confidential Colocation Client Data Center Buildout
Beaverton, OR
JH Kelly performed the mechanical and plumbing scopes of work for 3 phases of this colocation data center buildout for a confidential client. The project encompassed 24 MW and 393,000 sf. The DX cooling system required the installation of 198 CRAC units and 198 Condensers as well as numerous exhaust fans, air handling units, and fan power boxes. JH Kelly’s detailing and prefabrication capabilities allowed for extensive offsite prefabrication and racking of the over 68,000 lf of piping required for the system. This approach resulted in a safer, more efficient, and higher quality project.