Project Description
The scope of work included the installation of two 75’ back-on truck dumps designed and manufactured by Bruks-Siwertell. In addition to the dumps, JH Kelly installed the dust collection system, cyclone, and a 55' takeaway conveyor. JH Kelly was responsible for civil, structural, mechanical, and electrical. The project included over 1000 yards of concrete and 60 tons of structural steel and platforms. All new electrical infrastructure was installed on the site, including two 2500KVA owner furnished transformers, 4000amp switchgear, 8000 ft of covered cable tray, and two new new CMU MCC rooms. In addition to self-performed work, JH Kelly also managed the soil reinforcement work necessary to accommodate the project.