Skip to main content
Edit Page Control Panel

Project Description

JH Kelly's Electrical Service Department was contracted to install 70 new power outlets to support a planned workstation expansion at the Trillium US facility in Clackamas, OR.  The outlets specs ranged from 15amp/110volts to 60amp/480volts installed across three different areas.

Trillium US | Workstation Expansion

Trillium US | Workstation Expansion

Client
Trillium US
Location
Clackamas, OR
JH Kelly Role
Service Contractor - Electrical
Self-Performance
100%
Market Sector
Manufacturing
Contract Type
Lump Sum