Skip to main content
Edit Page Control Panel

Project Description

JH Kelly completed the wet mechanical scope of work at a confidential client’s campus in Chandler, AZ. The finished facility encompasses over 2.9m sf including 685,000 sf of cleanroom space. The facility was designed to produce the latest generation of logic chips. Our scope of work included the fabrication and installation of 98,000 lf of large-bore carbon steel, structural steel, and multiple large modules constructed off-site. Specific scope performed included: 

  • Steel wet-side mechanical piping
  • Piping modules
  • Structural steel support
  • Unistrut support structures
  • BIM modeling

Confidential | Fab 52.1

Confidential | Fab 52.1

Client
Confidential
Location
Chandler, AZ
JH Kelly Role
Wet Mechanical & Structural Steel Contractor
Self-Performance
90%
Market Sector
Semiconductor Manufacturing
Contract Type
Lump Sum
Year Completed
2025