Project Description

JH Kelly supported the construction of a new fab at Micron’s Boise, ID campus for the production of memory chips, including DRAM and HBM. The project encompasses 600,000 sf of production clean room space. The total complex encompasses 1.2 msf. On this phase, JH Kelly primarily supported the fabrication and installation of 97,000 lf of LTCHW, MTCHW, HRW piping, including the following:

  • Pipe Supports
  • Insulation
  • Deferred Engineering
  • Mains
  • Branch Piping
  • Equipment Connections
  • Support Steel
  • Piping systems range in size from 48” to 6”

Micron | Project Triton F08B

Micron | Project Triton F08B

Client
Micron Technology
Location
Boise, ID
JH Kelly Role
Wet Mechanical & Structural Steel Contractor
Self-Performance
90%
Market Sector
Semiconductor Manufacturing
Contract Type
Lump Sum
Year Completed
2026