Bechtel River Protection Project
Hanford, WA

Process Stainless Piping Spool for Vitrification Project

JH Kelly was awarded a purchase order to provide fabricated pipe spools for the River Protection Project at Hanford, Washington. This project, managed by Bechtel National for the United States Department of Energy, is intended to insure that the Columbia River is protected from contamination of radioactive materials buried at the Hanford site. Located in Southwest Washington, Hanford played a major role in the development and production of Cold War weapons systems. The remnants, stored underground for over 40 years, will now be processed and stored safely using a process called "vitrification."

JH Kelly's scope of supply for this project included the fabrication of 304L, 316L and Hastelloy pipe spools in sizes 1/2" through 18" with wall thicknesses ranging from Schedule 10 to Schedule 80. The stringent quality requirements of this project require "verbatim" compliance to project drawings and specifications. These exacting requirements demand attention to detail and rigorous work and inspection processes; including individual spool work packages, material traceability and radiographic inspection. The 800 spools assembled in our Longview, WA fabrication facility were used in each of the five buildings that are part of the vitrification process. Perhaps more importantly, the spools serve to protect one of the Northwest's great treasures: the Columbia River.

Special points of interest:
  • 800+ spools assembled at Longview, WA facility
  • 304L, 316L and Hallestoy pipe spools
  • Verbatim compliance
 
  
To print pdf version
 

JH Kelly is a 4th generation family-owned construction company serving the greater Pacific Northwest. We function as a self-performing industrial general contractor at process facilities. Our reputation for completing difficult process piping jobs is well known throughout the region and our success has led us to offer 3rd party services as a piping fabricator or module fabricator. Our integrated project approach includes self-performing concrete placement, functioning as a steel erector and providing equipment setting, millwrighting, and electrical services. For commercial HVAC projects, we can be found under tower cranes providing trade services as a plumbing contractor or mechanical contractor on a subcontracted basis.