JH Kelly self-performed the structural, mechanical and electrical installation of the #7 Boiler Scrubber BMACT. This complex, shutdown project entailed JH Kelly performing the following scopes of work:
- 2205 duplex stainless steel scrubber vessel
- 148-foot structural tower with 10-foot diameter ductwork stack tie-ins to existing research precipitator
- included all mechanical and electrical system installation
- 4-month shutdown
- crew peaked at 250 craft
- on time