jhkelly-logo
Vigor Hull ModuleVigor Hull Module

Vigor Hull 138

JH Kelly was awarded the steel, piping and electrical work scopes for a new Panamex-sized barge designed to transport anhydrous ammonia overseas. This was a design-build project for the mechanical and electrical systems using a modular approach. The project included 43 pre-assembled modules and 22 pre-assembled staircases. 37% of the mechanical and structural hours were spent in a fabrication shop. Check out this video for more!