Shell Truck Rack

Shell Terminal Upgrades

Tumwater, Washington

JH Kelly provided ongoing maintenance services in addition to completing mechanical pipe replacement, tubing installation, rack repairs, valve replacement, concrete demolition, form and pour pads, miscellaneous steel fabrication, and installation of motor alignments at the Shell terminals in Seattle and Tumwater, Washington. JH Kelly self-performed the civil, structural, and mechanical work scopes and electrical at the Seattle terminal.

Group-582

Ready to get started?