JH Kelly performed the ISBL and OSBL work scopes for a new Sulfur Recovery Unit (SRU) at the Shell Puget Sound Refinery in Anacortes, Washington. As the prime mechanical contractor, JH Kelly's work scope included structural steel, ASME code work, boiler, mechanical piping, and instrumentation. JHK self-performed over 125,000 man-hours installing over 300 tons of steel, 84 equipment sets, and 45,000 lf of pipe.
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.