CLSB Central Plant

OHSU | Collaborative Life Sciences Building

Portland, Oregon

JH Kelly provided design to assist mechanical and plumbing services for this classroom/laboratory complex. The facility includes the Skourtes Tower housing a new cutting-edge learning space and clinic for the OHSU School of Dentistry. The project included 6.77 miles of HVAC piping; 24.5 miles (excluding underground) of plumbing piping; 900 plumbing fixtures; 19 individual plumbing systems (DWV, sanitary sewer, hot/cold domestic water, fuel oil, dental vacuum, dental air, waste anesthesia gas disposal, reverse osmosis, deionized water, rainwater harvesting, stormwater management, acid waste, non-potable hot/cold water, natural gas, carbon dioxide, oxygen, and nitrous oxide system); and 2,490 lab gas/med gas outlets.

Group-582

Ready to get started?