JH Kelly provided the shell and core mechanical services for the North tower and as a result of that successful execution, was awarded the South tower work scopes. 45 miles of pipe was installed including medical gas systems, steam and condensate, chilled and heating water, domestic waters and reclaim water (bioreactor surplus from CHH North). Tie-ins between buildings were completed while the North tower was active.
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.