Lamb Weston Line 5 Modules
JH Kelly was contracted to design and build a $300,000,000 capital expenditure, 291,000 square foot French Fry facility for Lamb Weston in Hermiston, Oregon. In order to compress the construction schedule as much as possible, while providing a safer and more efficient construction environment, we maximized the use of offsite fabrication. In addition to pipe racking conduit racking and rooftop modules throughout the facility, JH Kelly fabricated larger truckable modules to build out the utilidor running down the spine of the facility. The modularized utilidor alone saved the project just under six months of onsite construction time. Each of the five modules were installed in under one hour.