JH Kelly acted as both the ECCM and MCCM and provided pre-engineered metal building erection services for the construction of two new schools for the Kelso School District. The schools included Lexington Elementary School, a 105,000 sf steel framed three-story elementary school with a pre-engineered metal building play area, and Wallace Elementary School, a 58,000 sf wood framed two-story elementary school.
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.