JH Kelly worked directly with ENGlobal Engineering, the engineering and technology partner at ConocoPhillips Ferndale refinery to to produce 16 prefabricated modules for a new sulfur reduction unit. JH Kelly completed the assembly of over 120 tons of structural steel and installed 1,705 carbon and stainless pipe spools totaling 23,871 diameter inches and all associated equipment to complete the modules. Theses modules allowed the refinery to move the majority of the work offsite and helped facilitate a tight shutdown window.