Englobal Conoco Phillips Module
Tosco converter barge

Englobal | Conoco Phillips Modules

Ferndale, Washington

JH Kelly was able to pre-fabricate all the piping spools then perform the complete structural steel assembly, equipment, and piping installation in our 40,000 square foot module assembly building. We were able to accommodate several substantial modules (over 120,000 pounds total weight) for assembly and loadout with our two overhead 50-ton cranes. The total module construction effort included structural steel assembly, piping, instrumentation, and electrical and was completed within a six-month construction schedule.

Group-582