Enscape_2020-08-13-09-18-42
04.29.21_02

Chang Tuh

Portland, OR

This project was for the demolition of two existing buildings on a two-acre site and construction of a new 22,600 sf food processing facility. The new metal building clad in insulated metal panels (IMP) featured lobby, office, breakroom, locker room, and laboratory space, as well as extensive dedicated food processing space, four freezers and a refrigerator. The scope also included the installation of a curing machine, spiral cooker, grill, spiral freezer, incline, decline, cooling, and curve/align conveyors, spiral packer, and other small equipment.

Group-582

Ready to get started?