JH Kelly was contracted by Boeing to retrofit two existing plane maintenance hangars into paint booths. The work scope included: demolish 14,000 lf of existing piping; demolish entire spline section of hangars; install 22,000 lf of new piping around hangar perimeter; install new offices, break/changing rooms, and paint mix/cleaning rooms; remodel/replace existing waste treatment facilities; and inspect/repair/replace existing waste retention pond liners/pumps and fire retention pond liners/pumps. JHK was subsequently contracted to provide two mechanical rooms onto the existing paint spray booths.
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.