jhkelly-logo
Armstrong World Industries Module

Armstrong World Industries Gas Fired Modules

St. Helens, OR

Pre-fabricated gas modules for Armstrong World Industries in St. Helens, OR were made in-house at our Vancouver, WA fabrication facility. These 27-foot truckable modules were part of pre-work for a large 5-day shutdown planned by Armstrong. JH Kelly was awarded the mechanical scope and initiated the fabrication of these modules prior to the shutdown. Four modules, each loaded with 7-10 gas burners with 10″ combustion air lines as well as 4″ natural gas lines pre-mounted, pre-tested and ready for “Plug and Play” installation.