Projects

SPECIAL FEATURES: Six month schedule, and installed all mechanical systems including piping, boilers and all associated equipment and machinery

Projects

WSU Energy Center

PULLMAN, WA

The WSU Energy Center was a complete greenfield central plant that included three new boilers, three new DA tanks, two new generators and associated pumps, tanks, chemical feed system, gas piping, steam piping and all associated piping and equipment.

JH Kelly installed steam and condensate piping in a new tunnel system from the new plant to interconnecting piping in an existing tunnel. The project also included upgrades to the existing piping system, pressure regulator replacement and expansion joint replacement throughout the university campus and tunnel system.

Printable Page

821 Third Avenue / PO Box 2038 / Longview, WA 98632T 360.423.5510 / F 360.423.9170 / mail@jhkelly.com