Tioga Natural Gas Plant: Pipe Fab

The expanded plant, which services natural gas produced from the Bakken tight-oil formation, now operates and processes about 120 MMcfd. Output is expected to ramp-up to 250 MMcfd, and could rise to more than 300 MMcfd.

Prior to the expansion, the plant processed only 100 MMcfd.

The expansion of the Tioga plant reduced the amount of gas flared at Hess’s Bakken operations to 15-20% from about 25% before the plant was shut down for construction work.

JH Kelly was awarded the Pipe Fabrication package for the entire upgrade and BOP work.  Project was completed in 2013.