Projects

SPECIAL FEATURES: Rebuild of Pond #15, world class fish sorting facility, peak manpower: 25, and 6-month duration

Projects

Lewis River Fish Hatchery

WOODLAND, WA

JH Kelly was awarded rebuilding of the Pond #15 salmon hatchery at the Lewis River Hatchery in Woodland, Washington.

The project has a world class fish sorting facility that includes fish transport flumes, fish and anesthesia flipper gates, fish crowders, fish pesculators, fish sorting table, electroanesthesia system, fish stunner, fish spawning and fish transfer tanks with control systems for all.

JH Kelly’s services included demolition, underground piping, concrete, electrical, structural and above ground piping all within a restricted job site and while the hatchery was still operating.

Printable Page

821 Third Avenue / PO Box 2038 / Longview, WA 98632T 360.423.5510 / F 360.423.9170 / mail@jhkelly.com