SPECIAL FEATURES: 27,000 square feet, 2,000 tons of cooling, 40,000 gallon fuel tank, 12 HVAC pumps, 8 air handlers and 2 cooling towers

Projects

Kaiser Westside Central Utility Plant

HILLSBORO, OR

To support the new Kaiser Westside Medical Center, a 27,000 square foot central utility plant (CUP) was constructed. It provides 2,000 tons of cooling with room to add 1,000 more tons.

JH Kelly installed five hot water boilers, each with 6,400 mph output, with room to add two more. A fluid skid system consisting of the following equipment was installed: two steam generators, one steam condensate receiver/surge tank, blow down separator, chemical feed tank, packaged thermal fluid steam equipment, thermal fluid catch tank, feed water deaererator, and thermal fluid deaereator/buffer tank.

Additionally, two cooling towers at 2,000 gpm each with room to add one more; 12 HVAC pumps with room to add four more; eight air handlers; one 40,000 gallon fuel tank; and one medical air compressor were installed.

Printable Page

821 Third Avenue / PO Box 2038 / Longview, WA 98632T 360.423.5510 / F 360.423.9170 / mail@jhkelly.com