Projects

SPECIAL FEATURES: Two GE PG7241FA combustion turbine generator sets, 500 MW power plant, 72,544 lineal feet of pipe, 600 cubic yards of concrete, and 350 tons of structural steel

Projects

Grays Harbor Energy Center

elma, WA

JH Kelly was selected by Grays Harbor Energy to act as primary general contractor to complete this 500MW natural gas combined cycle 2×1 power plant in Satsop, Washington.

The plant was originally started in 2001 but halted at an estimated 50% completion (primarily the civil/structural work only). The project resumed with new ownership in January 2007 and was substantially completed in April 2008.

Included in the JH Kelly work scope was assembly/erection of a General Electric D-11 steam turbine set; final assembly and alignment of two General Electric combustion turbine generator sets; completion of two Aalborg heat recovery boilers; BOP equipment installation/alignment; 72,544 lf of piping; structural steel completion; civil scope completion; BOP electrical, controls, and heat tracing; BOP paint and insulation; and the switchyard/substation.

Printable Page

821 Third Avenue / PO Box 2038 / Longview, WA 98632T 360.423.5510 / F 360.423.9170 / mail@jhkelly.com