Genentech – Project HOPE Central Utility Plant

Hired by McKinstry Co. to complete the balance of plant work for the central utility plant project, JH Kelly worked under Hoffman Construction in a Lump Sum contract.  Scope included mechanical piping and equipment setting of (9) pumps ranging from 40-125 hp, (3) 600 ton water cooled chillers, (3) 828 ton cooling towers, and (2) 600 hp gas fired boilers.

Chilled water, condenser water, steam/condensate and non-potable water were a part of our scope – and chemical injection piping was later added.

This project highlighted JH Kelly’s ability to execute a certain scope and were given increasingly more parts of the project based on peak performance.