SPECIAL FEATURES: 3,000 linear feet of 36" chilled water, 12" steam and 8" condensate lines, and a five month duration

Projects

ASU South Loop Project

Tempe, AZ

JH Kelly installed 3,000 linear feet of 36″ chilled water, 12″ steam and 8″ condensate lines that connect to Arizona State University’s new central plant. New lines run north to the Bio Center and south to the McAllister Village student housing center.

Minimizing campus disruption to students and other contractors working nearby was critical on this project. All pipe and equipment was staged at our four-acre industrial facility in Phoenix and not at the job site. All required subassemblies were fabricated at our shop and trucked to the site at installation time. The project was completed in 2005.