Project ProfileThe Mint Farm Energy Center Longview, WA  JH Kelly was the general contractor for a 311MW natural gas-fired combined cycle power plant in Longview, Washington. New owner, Wayzata Investment Partners, acquired the partially completed facility in a bankruptcy sale. The plant was completed in Fall 2007.
The project was approximately 50% complete when mothballed in 2001. JH Kelly's work scope included: • Developed a complete Material Inventory for materials and equipment procured by prior owner/contractor • Completion of civil/structural (Pipe racks, stair towers, Gas Compressor Pad, etc.) • Erect Heat Recovery Steam Generator (HRSG) • Installed roughly 20,000 LF of large bore pipe • Installed roughly 2,000 LF of P91 pipe • Installed roughly 6,000 LF of small bore pipe • Managed and coordinated multiple subcontractors including plant electrical, switchyard electrical, pipe insulation, painting, post weld heat treatment, relay testing and programming, and boiler chemical treatment • Installed steam turbine generator and enclosure • Installed 60” cooling water lines • Installed and calibrated roughly 500 instruments • Installed complete gas compressor station | | | | | | To print pdf version | |
|