Project Profile

Kaiser Westside Medical Center Central Utility Plant
Hillsboro, OR

Kaiser Westside Cup 

To support the new Kaiser Westside Medical Center, a 27,000 square foot central utility plant (CUP) is being constructed. It will provide 2,000 tons of cooling with room to add 1,000 more tons. JH Kelly will install five hot water boilers, each with 6,400 mph output, with room to add two more. A fluid skid system consisting of the following equipment will also be installed: two steam generators, one steam condensate receiver/surge tank, blow down separator, chemical feed tank, packaged thermal fluid steam equipment, thermal fluid catch tank, feed water deaererator, and thermal fluid deaereator/buffer tank.

Additionally, two cooling towers at 2,000 gpm each with room to add one more; 12 HVAC pumps with room to add four more; eight air handlers; one 40,000 gallon fuel tank; and one medical air compressor will be installed.

Special points of interest:
  • 27,000 square feet
  • 2,000 tons of cooling
  • 40,000 gallon fuel tank
  • 12 HVAC pumps
  • 8 air handlers
  • 2 cooling towers
 
  
To print pdf version
 

JH Kelly is a 4th generation family-owned construction company serving the greater Pacific Northwest. We function as a self-performing industrial general contractor at process facilities. Our reputation for completing difficult process piping jobs is well known throughout the region and our success has led us to offer 3rd party services as a piping fabricator or module fabricator. Our integrated project approach includes self-performing concrete placement, functioning as a steel erector and providing equipment setting, millwrighting, and electrical services. For commercial HVAC projects, we can be found under tower cranes providing trade services as a plumbing contractor or mechanical contractor on a subcontracted basis.