 Project Profile Boeing Paint Hangars Portland, OR
JH Kelly was contracted by Boeing to retrofit two existing plane maintenance hangars into paint booths. The work scope included: demolish 14,000 lf of existing piping; demolish entire spline section of hangars; install 22,000 lf of new piping around hangar perimeter; install new offices, break/changing rooms, and paint mix/cleaning rooms; remodel/replace existing waste treatment facilties; and inspect/repair/replace existing waste retention pond liners/pumps and fire retention pond liners/pumps.
We were subsequently contracted to provide two mechanical rooms onto the existing paint spray booths.
Special points of interest: - Demolish 14,000 lf of pipe
- Install 22,000 lf of new pipe
- Remodel/repair existing waste treatment facilities
- 0 safety incidents